You are here:
 
 

Georgia Institute of Technology- Eighth Street Student Apartments

 

Atlanta, Georgia

 
  INDUSTRY: Higher Education
  SERVICE AREA(S): Scheduling/Project Controls
 
 

As part of its role in creating and implementing an integrated planning process to manage Georgia Institute of Technology's preparations to serve as the site of the 1996 Olympic Village, Draper & Associates provided scheduling and project control services for the Eighth Street Student Apartments constructed on the campus. This project included three five-story building with a total of 235,000 SF built to house approximately 650 students in 166 apartment units.

The structures contain post-tensioned concrete frames, masonry and precast exteriors, and slate roofs. Each apartment and student bedroom was wired to fully utilize the full spectrum of electronic technology - voice and data lines as well as cable television.

Because the project had to be completed in time to house Olympic athletes, Draper & Associates implemented strict project controls and developed an aggressive construction schedule. As a result, this $21.5 million project was completed in only 16 months. The project included a central energy plant to serve a number of west campus buildings.

   
 
   

HOME   ABOUT   SERVICES   ENGAGEMENTS   MARKETS   LOCATIONS   CONTACT

 
 
Draper & Associates © 2007 All rights reserved